Phones: 132-6900-8273

How long does it take to order a backpack

2022-12-16 08:45:35

hebei leimande

In the luggage customization industry, many customers come to customize with drawings. Some customers want manufacturers to customize according to the design drawings they need, and some customize them completely according to the products provided by customers. There are still certain differences between these two customization modes. How long does it take to order a backpack?

1. Customized according to the design drawing

If it is customized according to the design drawing, it will take a little longer. Therefore, before production, the manufacturer must fully understand the customer's design ideas and ideas. If there are some places in the design drawing that cannot be achieved by luggage customization technology, then the manufacturer will inform the customer to make modifications, the two parties need to conduct a series of communication, in terms of product use, details, size, leather color, the hardware color, and other details, sometimes the hardware designed by the customer is not available in the market, then the customer It is necessary to change a different kind of hardware or find a hardware factory to make a custom mold. Of course, this process will take a certain amount of time. After confirming all the details, the manufacturer still needs to make a pre-production sample for the customer to confirm. After the customer confirms, production can begin. Generally speaking, it takes about 20 days to one month, so the time required is relatively long.

2. Customized according to the product picture

Customization based on product pictures is easier than design drawings. Of course, the premise is that the product pictures provided by the customer need to be clear, and you also need to provide detailed pictures of the bag and internal pictures. If there is no problem, you can prove the relevant pictures to the customer for confirmation. , you can place an order for production after it is correct. The overall process should take about 15-20 minutes.

IMG_1797


Products Recommended

© 2021 Hebei Leimande bag factory [Site map]